Question: 1. (20 points) Construct an LP model for this problem. Identify decision variables, constraints, and an objective function. Problem 2 (40 points). Yonsei is preparing

 1. (20 points) Construct an LP model for this problem. Identify

1. (20 points) Construct an LP model for this problem. Identify decision variables, constraints, and an objective function.

Problem 2 (40 points). Yonsei is preparing to launch two new products, product A and product B. Each product has three components: a base, a body and a top. The same base is used for both products, but the bodies and the tops are different. All components can be manufactured by Yonsei or purchased from outside suppliers. The manufacturing costs and purchase prices for the components ate summarized in the following table. Yonsei forecasts that 3000 product A and 2000 product B will be needed and Yonsei has to satisfy this demand. However, manufacturing capacity is limited. Yonsei can use at maximum 200 hours of manufacturing time, and the following table shows the manufacturing time (in minutes) per unit required for all components

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!