Question: 1 3 . 8 The snapback timing method was used to obtain average times for work elements in onc work cycle. The times are given

13.8 The snapback timing method was used to obtain average times for work elements in onc work cycle. The times are given in the table below. Element d is a machine-controlled clement and the time is constant. Elements a,b,c,e, and f are operator-controlled and were performance rated at 80%; however, elements e and f are performed during the mactinecontrolled element d. The machine allowance is zero (no extra time is added to the machine cycle), and the PFD allowance is 14%. Determine (a) the normal time for the cycle and (b) the standard time for the cycle.
\table[[Element,a,b,c,d,e,f
 13.8 The snapback timing method was used to obtain average times

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!