Question: 1 . A new engineer is evaluating whether to use a higher - voltage transmission line. It will cost ( $ 2 5

1. A new engineer is evaluating whether to use a higher-voltage transmission line. It will cost \(\$ 250,000\) more initially, but it will reduce transmission losses. The optimistic (with probability \(20\%\)), most likely (with probability \(70\%\)), and pessimistic projections for annual savings are \(\$ 20,000,\$ 15,000\), and \(\$ 8,000\), respectively. The interest rate is \(6\%\), and the transmission line should have a life of 30 years.
(a) Find the probability of the pessimistic projection. (10 points)
(b) What is the present worth (PW) for each estimated value? (10 points)
(c) What is the expected value for the present worth? (15 points)
(d) What is the risk of this present worth (use variance equation, then take the square root)?(15 points)
1 . A new engineer is evaluating whether to use a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!