1. A quality engineer is conducting a gauge R&R study of a new measurement system. He has had two operators measure 10 parts two times and has recorded the following data: XD = 0.060 =0.018 (none of the individual ranges exceed the control limit) Calculate the EV, OV, and RR. If the specification is 0.750 0.250, would the gauging system be considered to be acceptable? Would your answer change if the part being measured was a component of an emergency fire suppression system whose functioning depended on this part being within tolerance