Question: 1. All jobs require two steps. Suppose one worker performs step 1, and one worker performs step 2. In system A jobs must complete step

 1. All jobs require two steps. Suppose one worker performs step

1. All jobs require two steps. Suppose one worker performs step 1, and one worker performs step 2. In system A jobs must complete step 1 before starting step 2, i.e. the workers are in series. In system B jobs may start steps 1 and 2 independently, i.e. the workers are in parallel. Assume each worker can perform their step at the same rate. a. system A has higher capacity than system B. b. system A has the same capacity as system B