Question: 1. Consider two projects with the following cash flows: Project L (Cfo = -500, C01 = 200, C02 = 500, C03 = 700), Project S

1. Consider two projects with the following cash flows: Project L (Cfo = -500, C01 = 200, C02 = 500, C03 = 700), Project S ( (Cfo = -300, C01 = 400, C02 = 200, C03 = 100). What is the cross-over rate for these projects?

2. What is the internal rate of return of the following set of cash flows? CO = -300 C01 = 200 C02 = 300 C03 = 50 ?