Question: 1- Determine the total duration of the project. 2- Plot the resource loading table for the project. 3- Based on the heuristic procedure for leveling

1- Determine the total duration of the project.
2- Plot the resource loading table for the project.
3- Based on the heuristic procedure for leveling project, determine which activities must be shifted to improve the resource utilization.
Tablel presents the activities involved in a small project and the resource usage for each one. The maximum number of hours required per week is equal to 30. Table 1 Predecessors Activity A B D E F G H I J K Duration (Weeks) 3 5 1 1 7 6 4 3 6 4 3 A B B C D, E F, G H Labors (units/week) 9 6 4 10 16 9 5 8 2 3 7