Question: 1. For the given below, determine the following: Activity Predecessor Duration A 1 B A 8 A 4 D A 7 E B 2 M

1. For the given below, determine the following:

1. For the given below, determine the following: Activity Predecessor Duration A 1 B A 8 A 4 D A 7 E B 2 M 4 H DC 4 N D 9 Y E,H 5 F M 10 J H 2 S N 2 V Y,F,J 5 N V,S 1 1 A. Total project duration B. Early Start and Late Start for each activity C. Late Start and Late Finish for each activity D. Total Float of each activity E. Critical Path