Question: 1 point 5? A time study was conducted on a job. The observed times for 4 cycles {in minutes), and performance ratings, are listed below.

1 point 5? A time study was conducted on a job.
1 point 5? A time study was conducted on a job. The observed times for 4 cycles {in minutes), and performance ratings, are listed below. The allowance factor for thejob is 0.15. Observationl ObservationZ Observation3 Observation-4 Performance Rating 0.94 Find the "Standa rd Time" for this job. { Provide your answer rounded to 1 decimal. Example > 55.1] Type your