Question: b 19 points A time study was conducted on a job. The observed times for 4 cycles (in minutes), and performance ratings, are listed below.
b
19 points A time study was conducted on a job. The observed times for 4 cycles (in minutes), and performance ratings, are listed below. The allowance factor for the job is 0.16. Element Observation 1 Observation 2 Observation 3 Observation 4 Performance Rating A 23.1 21.0 224 210 104 Find the average cycle time for this job, also called the "Observed Time". (Provide your answer rounded to 1 decimal. Example --> 55.1) Type your
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
