Question: 1. The flow line below will be controlled by CONWIP. Unit processing times and internal setup times are given below. All times are given in

1. The flow line below will be controlled by
1. The flow line below will be controlled by CONWIP. Unit processing times and internal setup times are given below. All times are given in minutes. Machine Internal setup times per batch Unit processing times 1 10 8 15 18 30 3 This factory is currently operating 24 hours per day. Daily demand for the product is 75 umits. a) What is the difference between Kanban and CONWIP and what type of production system are these? b) o What is the minimum affordable batch size on this line? c) O What machine is the bottleneck on this line with this batch size? What is the bottleneck rate? d) 0 Given this batch size, what is the ideal number of cards this line should have to maximize throughput and minimize work in process inventory? 1. The flow line below will be controlled by CONWIP. Unit processing times and internal setup times are given below. All times are given in minutes. Machine Internal setup times per batch Unit processing times 1 10 8 15 18 30 3 This factory is currently operating 24 hours per day. Daily demand for the product is 75 umits. a) What is the difference between Kanban and CONWIP and what type of production system are these? b) o What is the minimum affordable batch size on this line? c) O What machine is the bottleneck on this line with this batch size? What is the bottleneck rate? d) 0 Given this batch size, what is the ideal number of cards this line should have to maximize throughput and minimize work in process inventory

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!