Question: 1. Using LPT priority would result in what sequence for Jobs A, B, C, and D if their process times are 4, 6, 5, 2
1.
Using LPT priority would result in what sequence for Jobs A, B, C, and D if their process times are 4, 6, 5, 2 respectively?
Group of answer choices
none of these
ABCD
DACB
DABC
DCBA
2.
Which of the following is not a concern of suppliers as they prepare to enter into JIT partnerships?
Group of answer choices
Suppliers feel that their processes are suited for larger lot sizes than the customer wants.
Suppliers are concerned that customers will present frequent engineering changes with inadequate lead time to deal with them.
Suppliers are concerned that frequent delivery of small quantities is economically prohibitive.
all of these represent JIT supplier concerns.
Suppliers feel that they would be less at risk if they contracted with more than one customer.
3.
The list of 5S's, although it looks like a housekeeping directive, supports lean production by
Group of answer choices
identifying non-value items and removing them, in the "sort/segregate" item
building good safety practices, in the "shine/sweep" item
reducing inventory, in the "standardize" item
increasing variability through standardized procedures, in the "standardize" item
eliminating wasted motion through ergonomic studies, in the "support" item
4.
For a machine to be a good candidate for preventive maintenance
Group of answer choices
the consequences of failure must exceed the cost of preventive maintenance and the MTBF distribution must have a relatively low standard deviation
the consequences of failure must be relatively unknown and, therefore, risky
the consequences of failure must exceed the cost of preventive maintenance and the MTBF must be relatively high
the consequences of failure must exceed the cost of preventive maintenance and the MTBF distribution must have a large standard deviation
the consequences of failure must exceed the cost of preventive maintenance and the MTBF must be relatively low
5.
As the number of components in a system connected in a series decreases, all other things being equal, the reliability of the system usually
Group of answer choices
increases, then decreases
decreases, then increases
decreases
increases
stays the same