Question: 1. Using the following table, develop the Master Production Schedule (MPS) for the manufacturing of a pair of shoes. Use leveling model within three periods

1. Using the following table, develop the Master
1. Using the following table, develop the Master Production Schedule (MPS) for the manufacturing of a pair of shoes. Use leveling model within three periods for production and a lead time of one period. 1 2 3 5 6 7 8 9 10 Demand 500 10001 800 Receive Balance 500 MPS