Question: Problem 1: With the following information determine the Master Production Schedule (MPS) for the manufacturing of a pair of shoes. Use three production periods for
Problem 1: With the following information determine the Master Production Schedule (MPS) for the manufacturing of a pair of shoes. Use three production periods for the leveling method and a lead time of 1 period.
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
| Demand |
|
|
|
|
|
|
| 500 | 1000 | 800 |
| Receive |
|
|
|
|
|
|
|
|
|
|
| Balance | 500 |
|
|
|
|
|
|
|
|
|
| MPS |
|
|
|
|
|
|
|
|
|
|
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock