Question: Problem 1: With the following information determine the Master Production Schedule (MPS) for the manufacturing of a pair of shoes. Use three production periods for

Problem 1: With the following information determine the Master Production Schedule (MPS) for the manufacturing of a pair of shoes. Use three production periods for the leveling method and a lead time of 1 period.

1

2

3

4

5

6

7

8

9

10

Demand

500

1000

800

Receive

Balance

500

MPS