Question: 1.0 Scenario (Project) Boundaries Complete Action Choose File -> Import scenario At the first level of the scenario, rename the top of the scenario tree

1.0 Scenario (Project) Boundaries Complete Action Choose File -> Import scenario At the first level of the scenario, rename the top of the scenario tree using the project name. Enter the target cost and the description of the project. Note: the target cost must be equal to the estimated cost in the mpp file and in your project plan. Select the following field and use the below options: History Enabled (do NOT select Manual History) Peek Enabled (100 peeks) Load Enabled (100 saves) Allow splitting of tasks Allow assigning/releasing resources Limited Resources Use System Engineering Feature O Allow Saving Simulations