Question: (10%) The Project Alpha network was drafted as you can see in the image below. Fill in the network with the ES, EF, Slack, LS,

(10%) The Project Alpha network was drafted as

(10%) The Project Alpha network was drafted as you can see in the image below. Fill in the network with the ES, EF, Slack, LS, LF and the minimum duration of the project. Highlight the Critical Path after you finish. (ILO 3) B F 12 5 A E H 9 10 10 10 ES D G ID EF Slack LS Duration LF 9 7 Minimum duration of the project (the duration is in weeks)