Question: 12/13 In a drum-buffer-rope scheduling system, the drum represents which of the following? Select one: O A. a drum of jobs to be selected O
12/13
In a drum-buffer-rope scheduling system, the "drum" represents which of the following? Select one: O A. a drum of jobs to be selected O B. the master schedule for the operation OC. the constraint against too much being loaded into the master schedule OD. a safety stock of material Which of the following files will contain information on manufacturing lead time and lot size? Select one: O A. bill of material O B. work center master OC. item master OD. shop order master