Question: In a drum - buffer - rope scheduling system, the drum represents which of the following? A ) The drum is established after the constraint

In a drum-buffer-rope scheduling system, the "drum" represents which of the following?
A) The drum is established after the constraint to protect the constraint from disruptions.
B) The drum pulls production to the constraint for processing.
C) The drum is the master schedule for the operation, which is focused around the pace of throughput as defined by the constraint.
D) The drum acts as the constraint against too much being loaded into the master schedule.
 In a drum-buffer-rope scheduling system, the "drum" represents which of the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!