Question: 15 The Work Breakdown Structure (WBS) (1 Point) O A hierarchical description of all the tasks to be performed O is only needed if a

15 The Work Breakdown Structure (WBS) (1 Point) O A hierarchical description of all the tasks to be performed O is only needed if a project planning software is used a plne sais of the main phases of the project Should cover task on an hour by hour basis aclu clw wl