Question: The Work Breakdown Structure (WBS) (1 Point) O A hierarchical description of all the tasks to be performed 4 Sould cover task on an hour

The Work Breakdown Structure (WBS) (1 Point) O A

The Work Breakdown Structure (WBS) (1 Point) O A hierarchical description of all the tasks to be performed 4 Sould cover task on an hour by hour basis a list of he main phases of the project O is only needed if a project planning software is used s