Question: 16. In a complex assembly operation, it is found that the learning curve rate is 70%. The standard time of 3 minutes per assembly is


16. In a complex assembly operation, it is found that the learning curve rate is 70%. The standard time of 3 minutes per assembly is reached after the 110" unit. Find i. The time required after the 100" unit. ii. The time required for the 200" unit. 17. Ross Recreations Company, LLC operates a summer camp in Monterey, Tennessee. The cost data for a 12-week summer camp are as follows. Charge per camper = $400/week Variable cost per camper = $220/week Fixed costs = $240,000 per summer season Capacity per week = 200 campers Determine: a). The total number of campers to breakeven for the season. b) The profit if the camp is operated at 901% capacity. c) The additional profit that can be made if a discount of $100 per week is given for another 10 campers