Question: 2.13) In a complex assembly operation, it is found that the learning curve rate is 75%. The standard time of 3 minutes per assembly is

2.13) In a complex assembly operation, it is
2.13) In a complex assembly operation, it is found that the learning curve rate is 75%. The standard time of 3 minutes per assembly is reached after the 115th unit. Find A) The time required for the very first unit? B) The time required for the 200th unit