Question: ( 2 0 ) A concrete form shown to the right is filled with wet concrete, which has a specific gravity of 2 . 5

(20) A concrete form shown to the right is filled with wet
concrete, which has a specific gravity of 2.5. Section
AB of the form is triangular, with a base that is 3 ft
wide.
FOREMULa MET HOD
Determine the resultant force of the concrete on
the side of the form.
FR
Sketch AB with the resultant force acting in the
correct location. (Do not simply draw it on the
original diagram.)
SKETCH
Determine the moment of the resultant force
about the base of the triangle (point B).
( 2 0 ) A concrete form shown to the right is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer