Question: 2. 11-2. Setup for a stamping operation required a time-consuming fixture installation and testing that took 4 hours each time a different part was to

2. 11-2. Setup for a stamping operation required

2. 11-2. Setup for a stamping operation required a time-consuming fixture installation and testing that took 4 hours each time a different part was to be produced; typically, 12 hours' production was made for inventory of a given stamping before the machine was stopped to permit setup for a new part. After careful process analysis, fixtures and transfer methods were revised to permit setup in 15 minutes. Discuss the implications for this change on (a) optimum batch size, (b) order frequency, and (c) machine and labor productivity

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!