Question: 2 . 3 . Given the table of setup and queue times as below, if the required part quantity Q = 1 0 0 and

2.3. Given the table of setup and queue times as below, if the required part quantity Q=100
and the cost rate is $80? hrs. Please answer the following questions. (10 points)
a. If the shop floor is a job shop, what's the manufacturing lead time? What's the total
cost?(5 points)
b. If the shop floor is a batch shop, what is the manufacturing lead time? What's the
total cost? (5 points)
 2.3. Given the table of setup and queue times as below,