Question: 2 . 7 2 . 7 . The average part produced in a certain batch manufacturing plant must be processed through an average six machines.

2.72.7. The average part produced in a certain batch manufacturing plant must be processed
through an average six machines. Twenty (20) new batches of parts are launched each
week. Average operation time =6min., average setup time =5 hours, average batch size =
25 parts, and average nonoperation time per batch =10hr? machine. There are 18
machines in the plant. The plant operates an average of 70 production hours per week.
Scrap rate is negligible. Determine: (a) manufacturing lead time for an average part, (b)
plant capacity, (c) plant utilization. (d) How would you expect the nonoperation time to be
affected by the plant utilization?
2 . 7 2 . 7 . The average part produced in a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!