Question: 2. Consider the following information for an assigned project: Activity Predecessor Optimistic A 5 B 6 C 3 D A 11 E B 8 F

2. Consider the following information for an

2. Consider the following information for an assigned project: Activity Predecessor Optimistic A 5 B 6 C 3 D A 11 E B 8 F C,E 3 G D 4 H F 5 | G,H 8 G 4 a. Perform network diagram b. Identify the critical step c. What is the probability of finishing the project in 47 days Most Likely 7 8 4 17 10 4 8 7 11 4 Pessimistic 8 12 5 25 12 5 9 9 17 4