Question: 2. Construct a product structure, determine the low-level codes, and complete the MRP analysis for the following, (10 marks) End item A is made from
2. Construct a product structure, determine the low-level codes, and complete the MRP analysis for the following, (10 marks) End item A is made from two B's and three C's C is made from one B and one D. Gross Requirements; (customer orders) for A is 500 in Week 6 and 500 in Week & Product Structure Part # A B Lead time and inventory is as follows. Low level On hand coda C D arks Total Hem # hom a UN Lead hem # time 2 weeks 2 weeks 2 weeks 1 week Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release Penod Period Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release Period Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release Penod Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release 1 1 Student Name and Number 1 1 300 800 1200 200 2 2 3 3 1 4 4 4 5 5 5 6 6 G G 6 7 102 7 7 13 8 8 19 9 5.0 10 10 10 10 11 N 11
End item A is madowing. (10 inariw)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
