Question: 2. Construct a product structure, determine the low-level codes, and complete the MRP analysis for the following. (10 marks) End item A is made from

2. Construct a product structure, determine the low-level codes, and complete the MRP analysis for the following. (10 marks) End item A is made from two B's and three C's arks Total C is made from one B and one D. Gross Requirements; (customer orders) for A is 500 in Week 6 and 500 in Week & Product Structure Part # A B C D Lead time and inventory is as follows. Low level On hand coda hem # LtM Hem # 15 Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release Lead time 2 weeks 2 weeks 2 weeks 1 week hem # Penod Period Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release Period Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release Period L- Gross Requirements On Hand Inventory Net Requirements Planned Order Receipt Planned Order Release 1200 200 1 1 Student Name and Number 1 300 800 1 2 2 3 ES 3 4 4 5 5 5 6 T G 6 7 7 7 13 8 8 18 19 9 50 10 11 10 1011 10 11
 2. Construct a product structure, determine the low-level codes, and complete

2. Construct a product structure i... analysis for the s

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!