Question: 2. For the small project with tasks as shown in the table below, please perform a CPM analysis to determine: The project duration. b. The

2. For the small project with tasks as shown in
2. For the small project with tasks as shown in the table below, please perform a CPM analysis to determine: The project duration. b. The slack for each task. c. The set of tasks in the critical path. d. The total project cost. Task Predecessors Duration (weeks) A B D E F A A A B C D E, F 3 6 10 11 8 5 6 Normal Cost (ks) 50 80 60 50 100 40 70