Question: 2 . Prepare a set of three - wire leveling notes for the data given and make the page check. The elevation of BM X

2. Prepare a set of three-wire leveling notes for the data given and make the page check. The elevation of BM X is 1482.909 ft and rod readings in (in feet) are: +S on BM X: U =6.573, M =6.321, L =6.070; -S on TP1: U =5.949, M =5.653, L =5.356; +S on TP1: U =5.470, M =5.195, L =4.921; -S on BM Y: U =5.674, M =5.453, L =5.231(3 decimal places).
3. Prepare a set of profile leveling notes for the data listed and show the page check. All data given in feet. The elevation of BM A is 659.08, and the elevation of BM B is 648.47. Rod readings are: +S on BM A,5.68; intermediate foresight (IFS) on 11+00,4.3; -S on TP1,7.56; +S on TP1,8.02; IFS on 12+00,6.6; on 12+50,5.3; on 13+00,5.8; on 14+00,6.3; -S on TP2,10.15; +S on TP2,5.28; IFS on 14+73,4.1; on 15+00,4.9, on 16+00,6.3; -S on TP3,7.77; +S on TP3,3.16; -S on BM B,7.23(2 decimal places).
4. What is the percent grade from station 11+00 to station 16+00 for the previous problem (1 decimal place)?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!