Question: 2. There are two power plants generating electricity, and three factories that need electricity in their production. The demand for each factory, the capacity of

2. There are two power plants generating

2. There are two power plants generating electricity, and three factories that need electricity in their production. The demand for each factory, the capacity of each power plant, and the transmission costs per MWatt ($) are given in the following tables: PP1 PP2 Capacity (MWatt) 1250 2000 F1 F2 F3 Demand (MWatt) 1500 1300 1750 Cost($/MWatt) F1 F2 F3 PP1 50 45 60 PP2 30 20 35 Note that total power plant capacity is insufficient to cover total demand of all factories. The penalty cost of unmet demand at F1, F2 and F3 is $120/MWatt, $115/MWatt and $128/MWatt, respectively. a. Formulate the linear programming model that minimizes the total cost. b. Solve the LP model using the MS Excel solver. Write down the optimal values of the decision variables and the optimal objective function value. Provide your Excel sheet, answer report, and sensitivity report

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!