Question: (24 points total -2 point each) 7. Short answer and multiple choice (elearly show the correct answer). The first two questions involve the project below

 (24 points total -2 point each) 7. Short answer and multiple

(24 points total -2 point each) 7. Short answer and multiple choice (elearly show the correct answer). The first two questions involve the project below with 5 activities. 7.1 Draw the network below. 7.2 How many starting activities are there? a) 1 . b) 2 . c) 3 . d) 4 . 7.3 Which strategy for adding capacity adds new factories before the demand had materialized for the product? a) Lead strategy: b) Lag strategy. c) Match strategy. 7.4 Control charts use statistical techniques to identify when non-random variation is present in a process. a) true. b) false. 7.5 There are two options for producing a product, A and B. Option A has a lower fixed cost than Option B, but a higher variable cost. If the fixed cost of Option A was increased, then the level of production that causes both options to have the same total cost would a) increase. b) decrease. c) stay the same

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!