Question: 3. (10 Points) 23 (10 Points) a) Construct the network figure for the project, using Activity on Arrow (AOA). b) Determine the ES, EF,

3. (10 Points) 23 (10 Points) a) Construct the network figure for the project, using Activity on Arrow (AOA). b) Determine the ES, EF, LS, LF, TF, FF, INDF and INTF for each activity. Show these values on the table provided. Act. A B C DE D F IPA CHI A B,C G C,D E,F G,H AAB Dur. ES 2 6 10 4 7 5352 EF LS LF Total Free Independent Interfering float Float Float float
Step by Step Solution
3.42 Rating (165 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
