Question: 3) A machine makes two components, call them type A and B. It takes 225 seconds to switch production between the component types. During that

3) A machine makes two components, call them type
3) A machine makes two components, call them type A and B. It takes 225 seconds to switch production between the component types. During that time no production occurs. When in production, each unit of A or B requires 0.6 seconds to be completed. The two components, A and B are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 1.45 seconds. Answer the questions below. a. Suppose the machine rotates between one batch of 1500 units of A and 1500 units of B. What is the average inventory of B components? b. If the production schedule could be adjusted with the goal of minimizing inventory in the process, how many units of A should be produced before switching to component B? Assume the same number of units of B would be produced as well. 3) A machine makes two components, call them type A and B. It takes 225 seconds to switch production between the component types. During that time no production occurs. When in production, each unit of A or B requires 0.6 seconds to be completed. The two components, A and B are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 1.45 seconds. Answer the questions below. a. Suppose the machine rotates between one batch of 1500 units of A and 1500 units of B. What is the average inventory of B components? b. If the production schedule could be adjusted with the goal of minimizing inventory in the process, how many units of A should be produced before switching to component B? Assume the same number of units of B would be produced as well

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!