Question: I need help with parts C & D A machine makes two components, call them types A and B. It takes 450 seconds to switch

I need help with parts C & D A machine makes two

I need help with parts C & D

A machine makes two components, call them types A and B. It takes 450 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. Answer is complete but not entirely correct. a. Suppose the machine rotates between one batch of 1800 units of A and 1800 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B? 40 component pairs per minute b. Suppose the machine rotates between one batch of 1800 units of A and 1800 units of B. What is the utilization of the machine? 50 percent c. Suppose the machine rotates between one batch of 1800 units of A and 1800 units of B. What is the average inventory of B components? 1,350 units d. 600 X units If the production schedule could be adjusted with the goal of minimizing inventory in the process without constraining the flow rate, how many units of A should be produced before switching to component B? Assume the same number of units of B would be produced as well. Do not round intermediate calculations. Final answers should be in whole numbers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!