Question: 3. Consider three machine types (i.e., A, B, and C) that are used at three workstations arranged in series. Workstation 1 has two machines A,

 3. Consider three machine types (i.e., A, B, and C) that

3. Consider three machine types (i.e., A, B, and C) that are used at three workstations arranged in series. Workstation 1 has two machines A, workstation 2 has a single machine B, and workstation 3 has a single machine C. For an arrival rate of 0.99 jobs per hour with CVa2=1, calculate the total system WIP and TIS if: a. The workstations are visited in the sequence 123. b. The workstations are visited in the sequence 132