Question: 3 ) Convert the microgrid system to a per - unit representation using a base of 1 MVA. Calculate the per - unit values for

3) Convert the microgrid system to a per-unit representation using a base of 1 MVA. Calculate the per-unit values for the transformer, solar PV array, BESS, and building loads.
4) Assuming balanced three-phase loads, calculate the line currents and phase voltages at each building's service entrance when operating at full load. Express your answers in both per-unit and actual values.
5) Develop a single-line diagram of the microgrid, treating each building as a load bus, the transformer as the slack bus, and the solar PV/BESS as one generation bus.
6) Construct the Y-bus matrix for the microgrid. The transformer is connected to load bus\#1, bus\#1 is connected to \#2, and \#2 is connected to load bus\#3 through lines with the impedance of j0.1X per-unit where \( X \) is the last digit of your ULID. Also, the BESS/PV bus (generation bus) is connected to load bus \(\# 3\) with the impedance of j 0.2 X . So, we're going to have 4 lines in our single line diagram.
7) Write power flow equations (you don't need to solve them)
3 ) Convert the microgrid system to a per - unit

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!