Question: 3. Develop the activity sequence model and determine the normal time for the following work activity: Sitting at the chair, pick up a hammer from
3. Develop the activity sequence model and determine the normal time for the following work activity: Sitting at the chair, pick up a hammer from the tool box (tool box within the reach, and hammer is in the crowded tool box) and put the hammer beside the toolbox.