Question: A batch settling test has been performed on an industrial wastewater having an initial suspended solids of 5 9 7 mg / L to develop
A batch settling test has been performed on an industrial wastewater having an initial
suspended solids of mgL to develop criteria for the design of a primary clarifier. The test
column was in in diameter and ft high, and sampling ports were located and ft from
the water surface in the column. The suspended solids remaining after the various sampling
times are given below:
The wastewater flow is MGD
Determine:
a The design overflow rate and detention time if percent of the suspended solids are to
be removed. Use scaleup factors: for overflow rate and for detention time.
b The diameter if a circular clarifier is used.
c The design diameter if equipment is available in ft increments of tank diameter.
d The depth of the tank.
Time min
Depth, ft
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock