Question: 4. A benchmark program is run on an 80 MHz processor. Based on the recorded measurements shown below, determine the effective CPI, MIPS rate, and

4. A benchmark program is run on an 80 MHz processor. Based on the recorded measurements shown below, determine the effective CPI, MIPS rate, and execution time for this program. Instruction Type Instruction Count CPI Integer Arithmetic 30,000 1 45,000 2. Data Transfer Floating Point 15,000 2 Control Transfer 10,000 2 Show your work for credit. (0.5 mark each) Effective CPI: MIPS rate: Execution time
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
