Question: Problem 1 (3 pts) A benchmark program is run on a 40 MHz processor. The executed program consists of 100,000 instruction executions, with the following
Problem 1 (3 pts) A benchmark program is run on a 40 MHz processor. The executed program consists of 100,000 instruction executions, with the following instruction mix and clock cycle count Instruction Type Instruction Cycles per instruction Integer Arithmetic Data transfer Floating Point Control Transfer Count 45000 32000 15000 8000 Determine the effective CPI, MIPS rate and execution time for this program
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
