Question: 4 ) A process for producing electron circuits has achieved very high yield levels. An average of only 8 defective parts per million is currently
A process for producing electron circuits has achieved very high yield levels. An average of only defective parts per million is currently produced.
awhat are the upper and lower control limits for a sample size of
bRecompute the upper and lower control limits for a sample size of
cWhich of these two sample sizes would you recommend? Explain why.
The Robin Hood Bank has noticed a decline in daily deposits. The average daily deposit has been running at $Million with an average range of $Million over the past year. The deposits over the past days have been and
aWhat are the CLUCL and LCL for the xand R charts based on a sample size of days
bCompute an average and range for the sample that consists of the past days Do the figures for the past six days suggest a change in the average or range from the past year?
A certain process has an upper specification limit of and a lower specification limit of The process standard deviation is and the mean is
aCalculate the Cp and the Cpk for this process.
bWhat could be done to improve the process capability Cpk to
A customer has specified that they require a process capability of Cpfor a certain product. Assume that the USLassume that the LSLand the process is centered within the specification range.
aWhat standard deviation should the process have?
bWhat is the process mean value?
cWhat can the company do if it is not capable of meeting these requirements?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
