Question: 5. Power stations are generally treated as (A) Light construction (B) Heavy construction (C) Industrial construction (D) Electrical construction Choose the true 6. The

5. Power stations are generally treated as (A) Light construction (B) Heavy

5. Power stations are generally treated as (A) Light construction (B) Heavy construction (C) Industrial construction (D) Electrical construction Choose the true 6. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as (A) Event (B) Free float (C) Dummy (D) Constraint 7. The area under the Beta distribution curve is divided into two equal parts by (A) Most likely time (B) Optimistic time (C) Pessimistic time (D) Expected time 8. Crash project duration is obtained by summing the (A) Normal durations for all the activities (B) Crash durations for all activities (C) Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities (D) Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities. 9. The most suitable type of equipment for compaction of cohesive soils is (A) Smooth-wheeled rollers (B) Vibratory rollers (C) Sheep foot rollers (D) Tampers

Step by Step Solution

3.42 Rating (155 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Answer 5 Correct option is c Industrial construction Reason A Power station also ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!