Question: 6 2 1 point The expected time in a PERT diagram includes measures of optimistic time, most probable time and unanticipated time. least probable time

62
1 point
The expected time in a PERT diagram includes measures of optimistic time, most probable time and unanticipated time.
least probable time and most probable time.
least probable and critical times.
most probable and pessimistic times.
 62 1 point The expected time in a PERT diagram includes