Question: 6 . Design a PLC program and prepare a typical I / O connection diagram and ladder logic program that will correctly execute the industrial
Design a PLC program and prepare a typical IO connection diagram and ladder logic program that will correctly execute the industrial control process in Figure The sequence of operation is as follows:
Figure Control process tor Problem
Product in position limit switch LS contacts close
The start button is pressed and the conveyor motor starts to move the product forward toward position A limit switch LS contacts open when the actuating arm returns to its normal position
The conveyor moves the product forward to position A and stops position detected by offtoon output pulses from the encoder, which are counted by an upcounter
A time delay of s occurs, after which the conveyor starts to move the product to limit switch LS and stops LS contacts close when the actuating arm is hit by the product
An emergency stop button is used to stop the process at any time.
If the sequence is interrupted by an emergency stop, counter and timer are reset automatically.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock