Question: Design a plug flow reactor ( PFR ) to remove a pollutant from a waste stream with a flow rate of 1 1 , 3
Design a plug flow reactor PFR to remove a pollutant from a waste stream with a
flow rate of Lday Laboratory batch reactor tests indicate that the pollutant
degrades according to a rate constant day Regulations mandate that
of the pollutant must be removed in the reactor before the waste stream is
discharged.
a What is the order of the reaction kinetics
b What is the minimum hydraulic retention time for PFR
c What will be the PFR volume required to treat this waste stream?