Question: 6- Given the project within the table below calculate (12 Points) a. The critical path b. The minimum project duration c. The amount of slack

6- Given the project within the table below calculate (12 Points) a. The critical path b. The minimum project duration c. The amount of slack for each activity Immediate Predecessors Activity A B D E F Duration (hours) 3 s 8 6 2 1 AB B, C D E F 4