Question: 6. What is process capability? Explain the difference between specification limits process limits. Consider a process with lower process control limit as 1.335 and process

 6. What is process capability? Explain the difference between specification limits

6. What is process capability? Explain the difference between specification limits process limits. Consider a process with lower process control limit as 1.335 and process control limit as 1.345. The lower specification limit is 1.338 and upper specification limit is 1.342. Using a diagram, comment on whether the process of meeting requirements. (10 points) 7. Each unit of A is composed of one unit of B, two units of C, and one unit composed of two units of D and three units of E. Items A, C, D, and E hav inventories of 20, 10, 20, and 10 units, respectively. Item B has a scheduled re units in Period 1, and C has a scheduled receipt of 50 units in Period 1. Lot-fo lot sizing is used for Items A and B. Item C requires a minimum lot size of 50 u E are required to be purchased in multiples of 100 and 50, respectively. Lead tim period for Items A, B, and C, and two periods for Items D and E. The gross red for A are 30 in Period 2, 30 in Period 5, and 40 in Period 8. Find the planned ord for all items. (20 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!