Question: 6.2. A double pipe exchanger was oversized because no data were available on the rate at which dirt accumulated. The exchanger was originally designed to

 6.2. A double pipe exchanger was oversized because no data were

6.2. A double pipe exchanger was oversized because no data were available on the rate at which dirt accumulated. The exchanger was originally designed to cool 13,000lb/hr of 100 per cent acetic acid from 250 to 150F by heating 19,000lb/hr of butyl alcohol from 100 to 157F. A design coefficient UD=85 was employed, but during initial operation a hot-liquid outlet temperature of 117F was obtained. It ' rose during operation at the average rate of 3F per month. What dirt factor should have been specified for a 6-month cleaning cycle

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!